From 2000 to 2023 Red Square has completed numerous residential projects. Here’s a brief timeline of the company’s life.
Red Square is founded by Ros. Ros recruits Rupert Mann who worked with Mary Fox Linton on One Aldwych. Our first office opens in the Kings Road, Chelsea.
Red Square undertake £8 million pound AON office interior rebrand. Richard joins to incorporate Red Square and formally structure the business.
Princes Gate SW7 – lateral conversion of two apartments into one for a developer. Challenge was creating linkage; floor levels between the two were 1200mm different.
As the team continues to grow, Red Square relocate to modern offices in Fulham, West London. This will be their home for over a decade.
Red Square are engaged to design and project manage a Frank Lloyd Wright inspired private home; a modern steel frame construction of 32,000 sqft.
Design & build project in Fulham including the addition of a new 1000 sqft basement, rear extension and ‘feature’ glass/stone stair case.
Having completed a West London Victorian house, Pro-Struct Ltd owned by Ros Oberg’s father, Mike O’Shea, merge with Red Square to become the in-house build team.
Ros spends 2 years in Nicaragua. Setting up a subsidiary company to import tools and materials for charity projects in El Lagartillo and surrounding areas.
Red Square create a split-level penthouse in Hampstead. The clients were inspired by contemporary architecture and the juxtaposition of new and old.
Commence design & build process for a large property in Kensington. Planning and design takes 2 years and full construction eighteen months.
Red Square are appointed to completely refurbish and modernise a Grade 2 listed Holland Park mews house, providing a full design & build service.
Ros returns from Nicaragua and design work for a house in Highgate begins. Starting her career in construction and enthused by design Ale Boni joins Red Square.
Highgate project is completed which included the addition of a large basement with leisure facilities and significant re-modelling of the existing property.
Major building works start in Kensington for the renovation and expansion of substantial family home near Holland Park, in West London.
Red Square win the exciting opportunity to remodel a Georgian house in Kensington; managing the entire process from concept to completion.
Complete Kensington family home which included an additional 3000 sqft basement with spa, gym, sauna, climbing wall and bespoke staircase.
A life long supporter of Chelsea Football Club, Richard and his son watch Chelsea beat Bayern Munich in the Champions League final.
Red Square are appointed to refurbish an impressive double fronted, detached family home in North London with an internal space of 7,557 sqft.
New build development of a 14,700 sqft private residence in 7.5 acres of ground commences. Requiring significant ground works and landscaping.
Red Square completely refurbish an Arts & Crafts house in Surrey. All original features and characteristics were retained and carefully restored.
Completion of large private home in Chalfont St. Giles with high specification interior, luxury spa and complex home automation system.
Based in the heart of the town, Red Square relocate their headquarters to Tunbridge Wells, just forty five minutes from London and their satellite offices.
The new owners of a six storey house in Knightsbridge appoint Red Square to fully refurbish, including the installation of a lift and swimming pool.
Having finished her architecture degree in Valencia, Barbara Roldan Ramos joins. First project providing technical design support for full refurbishment of a Victorian cottage in Windsor.
Red Square are appointed by EWA architects on an extensive refurbishment of a Kensington town house, including single storey rear extension and full refurbishment.
The Red Square reach extends to Borneo. Red Square are asked to design a contemporary family home which can cope with the local environment.
The owners of a large double fronted house in Hampstead ask Red Square to undertake a baroque inspired refurbishment and extension.
Red Square re brand to showcase their pedigree in high end residential and their finesse in the detailed construction of ‘restrained luxurious’ design.
Collaborating with the clients super yacht designer, in four weeks we demolished and installed two high specification bathrooms in a lateral apartment, within an old Wapping based converted warehouse.
The new owners of the Kensington house we rennovated in 2012 instructed us to refurbish their kitchen and dining area working with Poggenpohl.
Working with interior designer Staffan Tollgard, pre construction works start for the alteration and refurbishment of a period property in Hampstead.
Working in collaboration with Poggenpohl the Kitchen refurbishment of the Kensington House is successfully completed in seven weeks.
Hampstead project completed. It was critical to our client the project was completed during their holiday and before school started.
Phase one of the North London project finished. Extension, stone staircase, M&E works, external works, services, rib deck floor and mist coat.
Phase Two of North London Project started. Interior fit out of all bathrooms, decorative cornicing, bespoke doors, fireplaces and air conditioning.Due for completion November 2020
Red Square begins the renovation and refurbishment of a Victorian terraced house in East Sussex.
Considerate Constructors are an organisation whose principle goal is to improve the image and working standards of construction. Not only that, you have to be a member to operate in most London boroughs.
Site safety is priority and Red Square invest heavily in their processes. All on and offsite team members are accredited beyond what is required. With a continuous improvement strategy external site and corporate audits always score above 90%.
From 2000 to 2023 Red Square has completed numerous residential projects. Here’s a brief timeline of the company’s life.
Red Square is founded by Ros. Ros recruits Rupert Mann who worked with Mary Fox Linton on One Aldwych. Our first office opens in the Kings Road, Chelsea.
Red Square undertake £8 million pound AON office interior rebrand. Richard joins to incorporate Red Square and formally structure the business.
Princes Gate SW7 – lateral conversion of two apartments into one for a developer. Challenge was creating linkage; floor levels between the two were 1200mm different.
As the team continues to grow, Red Square relocate to modern offices in Fulham, West London. This will be their home for over a decade.
Red Square are engaged to design and project manage a Frank Lloyd Wright inspired private home; a modern steel frame construction of 32,000 sqft.
Design & build project in Fulham including the addition of a new 1000 sqft basement, rear extension and ‘feature’ glass/stone stair case.
Having completed a West London Victorian house, Pro-Struct Ltd owned by Ros Oberg’s father, Mike O’Shea, merge with Red Square to become the in-house build team.
Ros spends 2 years in Nicaragua. Setting up a subsidiary company to import tools and materials for charity projects in El Lagartillo and surrounding areas.
Red Square create a split-level penthouse in Hampstead. The clients were inspired by contemporary architecture and the juxtaposition of new and old.
Commence design & build process for a large property in Kensington. Planning and design takes 2 years and full construction eighteen months.
Red Square are appointed to completely refurbish and modernise a Grade 2 listed Holland Park mews house, providing a full design & build service.
Ros returns from Nicaragua and design work for a house in Highgate begins. Starting her career in construction and enthused by design Ale Boni joins Red Square.
Highgate project is completed which included the addition of a large basement with leisure facilities and significant re-modelling of the existing property.
Major building works start in Kensington for the renovation and expansion of substantial family home near Holland Park, in West London.
Red Square win the exciting opportunity to remodel a Georgian house in Kensington; managing the entire process from concept to completion.
Complete Kensington family home which included an additional 3000 sqft basement with spa, gym, sauna, climbing wall and bespoke staircase.
A life long supporter of Chelsea Football Club, Richard and his son watch Chelsea beat Bayern Munich in the Champions League final.
Red Square are appointed to refurbish an impressive double fronted, detached family home in North London with an internal space of 7,557 sqft.
New build development of a 14,700 sqft private residence in 7.5 acres of ground commences. Requiring significant ground works and landscaping.
Red Square completely refurbish an Arts & Crafts house in Surrey. All original features and characteristics were retained and carefully restored.
Completion of large private home in Chalfont St. Giles with high specification interior, luxury spa and complex home automation system.
Based in the heart of the town, Red Square relocate their headquarters to Tunbridge Wells, just forty five minutes from London and their satellite offices.
The new owners of a six storey house in Knightsbridge appoint Red Square to fully refurbish, including the installation of a lift and swimming pool.
Having finished her architecture degree in Valencia, Barbara Roldan Ramos joins. First project providing technical design support for full refurbishment of a Victorian cottage in Windsor.
Red Square are appointed by EWA architects on an extensive refurbishment of a Kensington town house, including single storey rear extension and full refurbishment.
The Red Square reach extends to Borneo. Red Square are asked to design a contemporary family home which can cope with the local environment.
The owners of a large double fronted house in Hampstead ask Red Square to undertake a baroque inspired refurbishment and extension.
Red Square re brand to showcase their pedigree in high end residential and their finesse in the detailed construction of ‘restrained luxurious’ design.
Collaborating with the clients super yacht designer, in four weeks we demolished and installed two high specification bathrooms in a lateral apartment, within an old Wapping based converted warehouse.
The new owners of the Kensington house we rennovated in 2012 instructed us to refurbish their kitchen and dining area working with Poggenpohl.
Working with interior designer Staffan Tollgard, pre construction works start for the alteration and refurbishment of a period property in Hampstead.
Working in collaboration with Poggenpohl the Kitchen refurbishment of the Kensington House is successfully completed in seven weeks.
Hampstead project completed. It was critical to our client the project was completed during their holiday and before school started.
Phase one of the North London project finished. Extension, stone staircase, M&E works, external works, services, rib deck floor and mist coat.
Phase Two of North London Project started. Interior fit out of all bathrooms, decorative cornicing, bespoke doors, fireplaces and air conditioning.Due for completion November 2020
Red Square begins the renovation and refurbishment of a Victorian terraced house in East Sussex.
Renovation of Victorian terraced property is completed. It was crucial to the client that the overall energy performance of the house was increased which was achieved.
Prior to joining Red Square, Vikki spent 10 years working in Retail. Having developed a keen interest during this time in compliance and administration, with an eye for detail and interest in the creative industries, Vikki joins to ensure that everything is perfectly organised. In her spare time Vikki enjoys travelling to distant shores and spending time with her family and friends.
Seymour has collaborated with Red Square since 2011 delivering integrated home technology solutions. His strength lies in a passion for detail and a commitment to seeing a project through to completion; combining sound technical knowledge with creative flair. Seymour is a graduate in electronic engineering, has a background in broadcast satellite, broadband communications and enjoys skiing and cycling.
Barbara studied architecture at Universitat Politecnica de Valencia in Spain, moved to the UK in 2015 and joined Red Square. Interested in art and science Barbara found architecture to be the perfect combination of both disciplines. Barbara loves engaging with the clients and bringing their vision to life. As well being a keen sports person Barbara is very interested in literature and cinema.
David spent 8 years in the Army, his military training has made him a great team player, mixing his time up between logistics, site support and health & safety. Over the last three years he has made a significant difference to our Health & Safety processes; and is currently waiting for his Nebosh results. David is a keen sailor and voracious reader.
Growing up in South Africa with a father who owned a residential construction company, Ros developed a unique blend of both creative and technical knowledge. She went on to study Interior Design and Architecture at university. After moving to the UK in 1998 and completing a number of successful commercial projects for Morgan Lovell, Ros returned to her first passion, and founded Red Square. In her spare time Ros loves to paint and sail.
Richard brings the commercial rigour to the company. Beginning his career in international logistics, he moved to interior workplace design and build where he held senior Director positions in the corporate world before leaving to pursue his entrepreneurial ambitions. Richard believes in forging strong long lasting relationships which have continually proven successful. In his spare time Richard loves watching sport, trips to the theatre and visiting art galleries.
Considerate Constructors are an organisation whose principle goal is to improve the image and working standards of construction. Not only that, you have to be a member to operate in most London boroughs.
Site safety is priority and Red Square invest heavily in their processes. All on and offsite team members are accredited beyond what is required. With a continuous improvement strategy external site and corporate audits always score above 90%.
Egyptian/Greek “Foreman of Foreman”
Roman Vitruvian Polymath
Itinerant Builders / Geometry / Stone-Craft
The ancient masterbuilder is a design-build professional, an artist of the built environment, who has existed for about 5,000 years. The history of this profession extends all the way back to the building of the pyramids of Egypt and the world’s first civilizations. In fact, the vast majority of the history of architecture, including a majority of its most significant works, were designed and built by the masterbuilder. The most beautiful places in the world whether houses, villages, or cities were done by this professional, who was responsible for the entire built environment.
Long, long ago, the Greeks gave the ancient masterbuilder the name ảpxitέktwv (architekton), from which the Romans derived the Latin name, architectus. Both words literally mean “masterbuilder” as denoting one responsible for the design and construction of the built environment. Our modern English word “architect” derives from these Greek and Roman terms and is their phonetic equivalent, stripped of the original meaning. Even so, the centuries-old masterbuilder remains a highly respected and legendary figure in today’s architectural community. Several things have been written about him in the record of history. The 1st century BC Roman writer, Vitruvius, highly regarded among architects and architecture schools as one of history’s most preeminent architects, wrote in his De architectura about the architectus saying that, “His personal service consists in craftsmanship and theory [fabrica et ratiocinatione]. Craftsmanship is continued and familiar practice, which is carried out by the hands in such material as is necessary for the purpose of a design.” Vitruvius goes on to warn that the architectus who relies solely on theory and ignores the craftsmanship skill of building with his own hands follows “a shadow and not reality.” (Excerpts taken from Vitruvius On Architecture, trans. from the Latin by F. Granger, Loeb Library [Harvard Univ. Press, 1970], vol. I, p. 7.) As for the Greek word architekton, it was used by several ancient Greek writers. It even appears in the New Testament scriptures of the Bible, where it is translated “masterbuilder” in I Corinthians 3:10—which reads: “According to the grace of God which is given unto me, as a wise masterbuilder, I have laid the foundation, and another buildeth thereon. But let every man take heed how he buildeth thereupon.” Here, as in every place among the ancients, the masterbuilder’s profession is described as one in which both design and construction reside as well as wisdom and knowledge.